|
Stephen Brown
2017-07-14 16:38:32
|
|
Hi,
I was curious if it is possible to have a simulation run multiple times without having to go back and do it every single time. For example, I was wondering if i could get monthly data for a simulation over a 5 year period without having to edit the start and stop date over and over again to get that data. Also, I would like to run the simulation for a handful of tickers based upon the same strategy to see which one performs better than the others.
Any thoughts or ideas would be appreciated.
Stephen
|
|